Basic Info.
Product Description
Prefabricated House Introduction | |
Main features: Dry installation, no construction garbage caused; Environment protective materials adopted, repeated use and LOW COST,also durable,and can be disassemble and assemble again.It is suitable for camps,school and temporary buildings such as dormitory, canteen, recreation room, washing room,Prayer Roomand so on. | |
Technical Parameter of standard prefabricated house: | |
1. Wind resistance: Grade 11(wind speed≤111.5km/h) 2. Earthquake resistance: Grade 7 3. Live load capacity of roofing: 0.5kn/m2 3. First floor load capacity: 150 kg/m2 4. Live load of corridor is 2.0kn/ m2 5. Installation:Four skilled workers can finish installation of 100sqm in 8 hours for the light steel structure. 6. Dispatch Technician:We can provide the service of installation, supervision and training go abroad. | |
Item | Material Introduction |
Steel frame | Square Steel Tube and Channel steel Roof Truss; Surface treatment:painted or pre-galvanized |
Steel Purlin | C-section Channel steel |
Roof | Sandwich panel,thickness be 50mm,75mm or 100mm; Insulation material:EPS,Fiberglass or Rock wool; Ceiling:Gypsum Board or PVC Board |
Wall and Partition | Sandwich panel,thickness be 50mm,75mm or 100mm; Insulation material:EPS,Fiberglass or Rock wool; |
Door | Light steel door |
Windows | PVC frame sliding window with glass and screen |
Ground Floor | Concrete,Ceramic Tiles or PVC material grain pattern floor leather |
First floor | Plywood +PVC material grain pattern floor leather |
1. Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp,warehouse,office and so on as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building:
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO and EN1090 standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision support:
We could dispatch our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
You're warmly welcomed to visit our company